Exactly place the screw-on brackets and fasten the precisely aligned posts. Screw the rafters to the posts, put in the struts and affix them to purlins and posts.
The purlin at the back gets attached to the ouse wall with a plug. Follow this with the rafters and roof boards.
Put seeling sheeting onto the roof structure.
Now you can prepare the double-bridged plates for installation.